Files
thrillwiki_django_no_react/shared/docs/memory-bank/projects/company-migration-analysis.md
pacnpal d504d41de2 feat: complete monorepo structure with frontend and shared resources
- Add complete backend/ directory with full Django application
- Add frontend/ directory with Vite + TypeScript setup ready for Next.js
- Add comprehensive shared/ directory with:
  - Complete documentation and memory-bank archives
  - Media files and avatars (letters, park/ride images)
  - Deployment scripts and automation tools
  - Shared types and utilities
- Add architecture/ directory with migration guides
- Configure pnpm workspace for monorepo development
- Update .gitignore to exclude .django_tailwind_cli/ build artifacts
- Preserve all historical documentation in shared/docs/memory-bank/
- Set up proper structure for full-stack development with shared resources
2025-08-23 18:40:07 -04:00

6.1 KiB

Company Migration Analysis - Complete Codebase Assessment

Date: 2025-07-04
Status: ANALYSIS COMPLETE
Risk Level: 🔴 HIGH (300+ references, complex dependencies)
Next Phase: Documentation → Implementation → Testing

Executive Summary

Comprehensive analysis of the ThrillWiki Django codebase has identified 300+ company references across the entire application. The company entity is deeply integrated throughout the system, requiring a carefully orchestrated migration to replace it with a new relationship structure (Operators, PropertyOwners, Manufacturers, Designers).

Analysis Findings Overview

Total Impact Assessment

  • 300+ Company References found across entire codebase
  • Critical Dependencies in core models (parks, rides)
  • Complex Integration with pghistory tracking system
  • Extensive Template Usage across 6+ template files
  • Comprehensive Test Coverage requiring updates (429 lines)
  • URL Pattern Dependencies across 22 endpoints

Detailed Breakdown by Component

1. Models & Database Schema

Location: companies/models.py, parks/models.py:57, rides/models.py:173

Critical Dependencies Identified:

  • Parks Model (parks/models.py:57): Foreign key relationship to Company.owner
  • Rides Model (rides/models.py:173): Foreign key relationship to Company (manufacturer)
  • Company Model: Core entity with multiple relationships and pghistory integration

Database Schema Impact:

  • Foreign key constraints across multiple tables
  • pghistory tracking tables requiring migration
  • Potential data integrity concerns during transition

2. URL Patterns & Routing

Location: companies/urls.py

22 URL Patterns Identified:

  • Company list/detail views
  • Company creation/editing endpoints
  • Company search and filtering
  • Company-related API endpoints
  • Admin interface routing
  • Company profile management

3. Templates & Frontend

Location: templates/companies/, cross-references in other templates

6 Company Templates + Cross-References:

  • Company detail pages
  • Company listing pages
  • Company creation/editing forms
  • Company search interfaces
  • Company profile components
  • Cross-references in park/ride templates

4. Test Coverage

Location: companies/tests.py

429 Lines of Test Code:

  • Model validation tests
  • View functionality tests
  • Form validation tests
  • API endpoint tests
  • Integration tests with parks/rides
  • pghistory tracking tests

5. Configuration & Settings

Locations: Various configuration files

Integration Points:

  • Django admin configuration
  • Search indexing configuration
  • Signal handlers
  • Middleware dependencies
  • Template context processors

pghistory Integration Complexity

Historical Data Tracking

  • Company changes tracked in pghistory tables
  • Historical relationships with parks/rides preserved
  • Migration must maintain historical data integrity
  • Complex data migration required for historical records

Risk Assessment

  • Data Loss Risk: HIGH - Historical tracking data could be lost
  • Integrity Risk: HIGH - Foreign key relationships in historical data
  • Performance Risk: MEDIUM - Large historical datasets to migrate

New Relationship Structure Analysis

Target Architecture

Rides → Parks (required, exists)
Rides → Manufacturers (optional, rename current company relationship)
Rides → Designers (optional, exists)
Parks → Operators (required, replace Company.owner)
Parks → PropertyOwners (optional, new concept)

Key Relationship Changes

  1. Company.owner → Operators: Direct replacement for park ownership
  2. Company (manufacturer) → Manufacturers: Rename existing ride relationship
  3. PropertyOwners: New optional relationship for parks (usually same as Operators)
  4. Designers: Existing relationship, no changes required

Critical Migration Challenges

1. Data Preservation

  • 300+ company records need proper categorization
  • Historical data must be preserved and migrated
  • Relationship integrity must be maintained throughout

2. Dependency Order

  • Models must be updated before views/templates
  • Foreign key relationships require careful sequencing
  • pghistory integration adds complexity to migration order

3. Testing Requirements

  • 429 lines of tests need updates
  • Integration tests across multiple apps
  • Historical data integrity verification

4. URL Pattern Migration

  • 22 URL patterns need updates or removal
  • Backward compatibility considerations
  • Search engine optimization impact

Risk Mitigation Requirements

Database Safety

  • MANDATORY: Full database backup before any migration steps
  • MANDATORY: Dry-run testing of all migration scripts
  • MANDATORY: Rollback procedures documented and tested

Testing Strategy

  • Phase-by-phase testing after each migration step
  • Full test suite execution before proceeding to next phase
  • pghistory data integrity verification at each checkpoint

Deployment Considerations

  • Zero-downtime migration strategy required
  • Backward compatibility during transition period
  • Monitoring and alerting for migration issues

Implementation Readiness Assessment

Prerequisites Complete

  • Comprehensive codebase analysis
  • Dependency mapping
  • Risk assessment
  • Impact quantification

Next Phase Requirements

  • Detailed migration plan creation
  • Migration script development
  • Test environment setup
  • Backup and rollback procedures
  • Implementation timeline

Conclusion

The company migration represents a HIGH-RISK, HIGH-IMPACT change affecting 300+ references across the entire ThrillWiki codebase. The analysis confirms the migration is feasible but requires:

  1. Meticulous Planning: Detailed phase-by-phase implementation plan
  2. Comprehensive Testing: Full test coverage at each migration phase
  3. Data Safety: Robust backup and rollback procedures
  4. Careful Sequencing: Critical order of operations for safe migration

Recommendation: Proceed to detailed migration planning phase with emphasis on data safety and comprehensive testing protocols.