thrillwiki_django_no_react/shared/docs/memory-bank/projects/company-migration-plan.md
pacnpal d504d41de2 feat: complete monorepo structure with frontend and shared resources
- Add complete backend/ directory with full Django application
- Add frontend/ directory with Vite + TypeScript setup ready for Next.js
- Add comprehensive shared/ directory with:
  - Complete documentation and memory-bank archives
  - Media files and avatars (letters, park/ride images)
  - Deployment scripts and automation tools
  - Shared types and utilities
- Add architecture/ directory with migration guides
- Configure pnpm workspace for monorepo development
- Update .gitignore to exclude .django_tailwind_cli/ build artifacts
- Preserve all historical documentation in shared/docs/memory-bank/
- Set up proper structure for full-stack development with shared resources
2025-08-23 18:40:07 -04:00

9.6 KiB

Company Migration Implementation Plan

Date: 2025-07-04
Status: 📋 PLANNING COMPLETE
Risk Level: 🔴 HIGH
Dependencies: company-migration-analysis.md

Migration Strategy Overview

This document outlines the detailed 4-phase migration strategy to safely remove the Company entity and replace it with the new relationship structure (Operators, PropertyOwners, Manufacturers, Designers) across the ThrillWiki Django application.

Phase-by-Phase Implementation Plan

Phase 1: Create New Entities 🏗️

Duration: 2-3 days
Risk Level: 🟡 LOW
Rollback: Simple (new entities can be removed)

1.1 Create New Models

# New models to create:
- Operators (replace Company.owner for parks)
- PropertyOwners (new optional relationship for parks)
- Manufacturers (rename/replace Company for rides)
- Designers (already exists, verify structure)

1.2 Database Schema Changes

  • Create new model files
  • Generate initial migrations
  • Apply migrations to create new tables
  • Verify new table structure

1.3 Admin Interface Setup

  • Register new models in Django admin
  • Configure admin interfaces for new entities
  • Set up basic CRUD operations

1.4 Phase 1 Testing

  • Verify new models can be created/edited
  • Test admin interfaces
  • Confirm database schema is correct
  • Run existing test suite (should pass unchanged)

Phase 2: Data Migration 📊

Duration: 3-5 days
Risk Level: 🔴 HIGH
Rollback: Complex (requires data restoration)

2.1 Data Analysis & Mapping

-- Analyze existing company data:
SELECT 
    company_type,
    COUNT(*) as count,
    usage_context
FROM companies_company 
GROUP BY company_type;

2.2 Data Migration Scripts

  • Company → Operators: Migrate companies used as park owners
  • Company → Manufacturers: Migrate companies used as ride manufacturers
  • PropertyOwners = Operators: Initially set PropertyOwners same as Operators
  • Historical Data: Migrate pghistory tracking data

2.3 Data Migration Execution

# Critical sequence:
1. uv run manage.py makemigrations --dry-run  # Preview changes
2. Database backup (MANDATORY)
3. uv run manage.py migrate  # Apply data migration
4. Verify data integrity
5. Test rollback procedures

2.4 Data Integrity Verification

  • Verify all company records migrated correctly
  • Check foreign key relationships maintained
  • Validate pghistory data preservation
  • Confirm no data loss occurred

Phase 3: Update Dependencies 🔄

Duration: 5-7 days
Risk Level: 🟠 MEDIUM-HIGH
Rollback: Moderate (code changes can be reverted)

3.1 Models Update (Critical First)

Order: MUST be completed before views/templates

# parks/models.py updates:
- Replace: company = ForeignKey(Company)
- With: operator = ForeignKey(Operators)
- Add: property_owner = ForeignKey(PropertyOwners, null=True, blank=True)

# rides/models.py updates:
- Replace: company = ForeignKey(Company) 
- With: manufacturer = ForeignKey(Manufacturers, null=True, blank=True)

3.2 Views Update

Dependencies: Models must be updated first

  • Update all company-related views
  • Modify query logic for new relationships
  • Update context data for templates
  • Handle new optional relationships

3.3 Templates Update

Dependencies: Views must be updated first

  • Update 6+ company templates
  • Modify cross-references in park/ride templates
  • Update form templates for new relationships
  • Ensure responsive design maintained

3.4 Tests Update

Dependencies: Models/Views/Templates updated first

  • Update 429 lines of company tests
  • Modify integration tests
  • Update test fixtures and factories
  • Add tests for new relationships

3.5 Signals & Search Update

  • Update Django signals for new models
  • Modify search indexing for new relationships
  • Update search templates and views
  • Verify search functionality

3.6 Admin Interface Update

  • Update admin configurations
  • Modify admin templates if customized
  • Update admin permissions
  • Test admin functionality

Phase 4: Cleanup 🧹

Duration: 2-3 days
Risk Level: 🟡 LOW-MEDIUM
Rollback: Difficult (requires restoration of removed code)

4.1 Remove Companies App

  • Remove companies/ directory
  • Remove from INSTALLED_APPS
  • Remove URL patterns
  • Remove imports across codebase

4.2 Remove Company Templates

  • Remove templates/companies/ directory
  • Remove company-related template tags
  • Clean up cross-references
  • Update template inheritance

4.3 Documentation Update

  • Update API documentation
  • Update user documentation
  • Update developer documentation
  • Update README if needed

4.4 Final Cleanup

  • Remove unused imports
  • Clean up migration files
  • Update requirements if needed
  • Final code review

Critical Order of Operations

⚠️ MANDATORY SEQUENCE ⚠️

1. Phase 1: Create new entities (safe, reversible)
2. Phase 2: Migrate data (HIGH RISK - backup required)
3. Phase 3: Update dependencies in order:
   a. Models FIRST (foreign keys)
   b. Views SECOND (query logic)
   c. Templates THIRD (display logic)
   d. Tests FOURTH (validation)
   e. Signals/Search FIFTH (integrations)
   f. Admin SIXTH (management interface)
4. Phase 4: Cleanup (remove old code)

🚫 NEVER DO THESE OUT OF ORDER:

  • Never update views before models
  • Never update templates before views
  • Never remove Company model before data migration
  • Never skip database backups
  • Never proceed without testing previous phase

Database Schema Migration Strategy

New Relationship Structure

Current:
Parks → Company (owner)
Rides → Company (manufacturer)

Target:
Parks → Operators (required, replaces Company.owner)
Parks → PropertyOwners (optional, new concept)
Rides → Manufacturers (optional, replaces Company)
Rides → Designers (optional, exists)

Migration Script Approach

# Data migration pseudocode:
def migrate_companies_to_new_structure(apps, schema_editor):
    Company = apps.get_model('companies', 'Company')
    Operator = apps.get_model('operators', 'Operator')
    Manufacturer = apps.get_model('manufacturers', 'Manufacturer')
    
    # Migrate park owners
    for company in Company.objects.filter(used_as_park_owner=True):
        operator = Operator.objects.create(
            name=company.name,
            # ... other fields
        )
        # Update park references
    
    # Migrate ride manufacturers  
    for company in Company.objects.filter(used_as_manufacturer=True):
        manufacturer = Manufacturer.objects.create(
            name=company.name,
            # ... other fields
        )
        # Update ride references

Testing Strategy

Phase-by-Phase Testing

# After each phase:
1. uv run manage.py test  # Full test suite
2. Manual testing of affected functionality
3. Database integrity checks
4. Performance testing if needed
5. Rollback testing (Phase 2 especially)

Critical Test Areas

  • Model Relationships: Foreign key integrity
  • Data Migration: No data loss, correct mapping
  • pghistory Integration: Historical data preserved
  • Search Functionality: New relationships indexed
  • Admin Interface: CRUD operations work
  • Template Rendering: No broken references

Risk Mitigation Procedures

Database Safety Protocol

# MANDATORY before Phase 2:
1. pg_dump thrillwiki_db > backup_pre_migration.sql
2. Test restore procedure: psql thrillwiki_test < backup_pre_migration.sql
3. Document rollback steps
4. Verify backup integrity

Rollback Procedures

Phase 1 Rollback (Simple)

# Remove new models:
uv run manage.py migrate operators zero
uv run manage.py migrate manufacturers zero
# Remove from INSTALLED_APPS

Phase 2 Rollback (Complex)

# Restore from backup:
dropdb thrillwiki_db
createdb thrillwiki_db  
psql thrillwiki_db < backup_pre_migration.sql
# Verify data integrity

Phase 3 Rollback (Moderate)

# Revert code changes:
git revert <migration_commits>
uv run manage.py migrate  # Revert migrations
# Test functionality

Success Criteria

Phase 1 Success

  • New models created and functional
  • Admin interfaces working
  • Existing functionality unchanged
  • All tests passing

Phase 2 Success

  • All company data migrated correctly
  • No data loss detected
  • pghistory data preserved
  • Foreign key relationships intact
  • Rollback procedures tested

Phase 3 Success

  • All 300+ company references updated
  • New relationships functional
  • Templates rendering correctly
  • Search functionality working
  • All tests updated and passing

Phase 4 Success

  • Companies app completely removed
  • No broken references remaining
  • Documentation updated
  • Code cleanup completed

Timeline Estimate

Phase Duration Dependencies Risk Level
Phase 1 2-3 days None 🟡 LOW
Phase 2 3-5 days Phase 1 complete 🔴 HIGH
Phase 3 5-7 days Phase 2 complete 🟠 MEDIUM-HIGH
Phase 4 2-3 days Phase 3 complete 🟡 LOW-MEDIUM
Total 12-18 days Sequential execution 🔴 HIGH

Implementation Readiness

Prerequisites

  • Comprehensive analysis completed
  • Migration plan documented
  • Risk assessment completed
  • Success criteria defined

Next Steps

  • Set up dedicated migration environment
  • Create detailed migration scripts
  • Establish backup and monitoring procedures
  • Begin Phase 1 implementation

Recommendation: Proceed with Phase 1 implementation in dedicated environment with comprehensive testing at each step.