- Implemented OperatorListView and OperatorDetailView for managing operators.
- Created corresponding templates for operator listing and detail views.
- Added PropertyOwnerListView and PropertyOwnerDetailView for managing property owners.
- Developed templates for property owner listing and detail views.
- Established relationships between parks and operators, and parks and property owners in the models.
- Created migrations to reflect the new relationships and fields in the database.
- Added admin interfaces for PropertyOwner management.
- Implemented tests for operators and property owners.
2025-07-04 14:49:36 -04:00

340 lines
9.6 KiB
Markdown

# Company Migration Implementation Plan
**Date**: 2025-07-04
**Status**: 📋 PLANNING COMPLETE
**Risk Level**: 🔴 HIGH
**Dependencies**: [`company-migration-analysis.md`](./company-migration-analysis.md)
## Migration Strategy Overview
This document outlines the detailed 4-phase migration strategy to safely remove the Company entity and replace it with the new relationship structure (Operators, PropertyOwners, Manufacturers, Designers) across the ThrillWiki Django application.
## Phase-by-Phase Implementation Plan
### Phase 1: Create New Entities 🏗️
**Duration**: 2-3 days
**Risk Level**: 🟡 LOW
**Rollback**: Simple (new entities can be removed)
#### 1.1 Create New Models
```python
# New models to create:
- Operators (replace Company.owner for parks)
- PropertyOwners (new optional relationship for parks)
- Manufacturers (rename/replace Company for rides)
- Designers (already exists, verify structure)
```
#### 1.2 Database Schema Changes
- Create new model files
- Generate initial migrations
- Apply migrations to create new tables
- Verify new table structure
#### 1.3 Admin Interface Setup
- Register new models in Django admin
- Configure admin interfaces for new entities
- Set up basic CRUD operations
#### 1.4 Phase 1 Testing
- Verify new models can be created/edited
- Test admin interfaces
- Confirm database schema is correct
- Run existing test suite (should pass unchanged)
### Phase 2: Data Migration 📊
**Duration**: 3-5 days
**Risk Level**: 🔴 HIGH
**Rollback**: Complex (requires data restoration)
#### 2.1 Data Analysis & Mapping
```sql
-- Analyze existing company data:
SELECT
company_type,
COUNT(*) as count,
usage_context
FROM companies_company
GROUP BY company_type;
```
#### 2.2 Data Migration Scripts
- **Company → Operators**: Migrate companies used as park owners
- **Company → Manufacturers**: Migrate companies used as ride manufacturers
- **PropertyOwners = Operators**: Initially set PropertyOwners same as Operators
- **Historical Data**: Migrate pghistory tracking data
#### 2.3 Data Migration Execution
```bash
# Critical sequence:
1. uv run manage.py makemigrations --dry-run # Preview changes
2. Database backup (MANDATORY)
3. uv run manage.py migrate # Apply data migration
4. Verify data integrity
5. Test rollback procedures
```
#### 2.4 Data Integrity Verification
- Verify all company records migrated correctly
- Check foreign key relationships maintained
- Validate pghistory data preservation
- Confirm no data loss occurred
### Phase 3: Update Dependencies 🔄
**Duration**: 5-7 days
**Risk Level**: 🟠 MEDIUM-HIGH
**Rollback**: Moderate (code changes can be reverted)
#### 3.1 Models Update (Critical First)
**Order**: MUST be completed before views/templates
```python
# parks/models.py updates:
- Replace: company = ForeignKey(Company)
- With: operator = ForeignKey(Operators)
- Add: property_owner = ForeignKey(PropertyOwners, null=True, blank=True)
# rides/models.py updates:
- Replace: company = ForeignKey(Company)
- With: manufacturer = ForeignKey(Manufacturers, null=True, blank=True)
```
#### 3.2 Views Update
**Dependencies**: Models must be updated first
- Update all company-related views
- Modify query logic for new relationships
- Update context data for templates
- Handle new optional relationships
#### 3.3 Templates Update
**Dependencies**: Views must be updated first
- Update 6+ company templates
- Modify cross-references in park/ride templates
- Update form templates for new relationships
- Ensure responsive design maintained
#### 3.4 Tests Update
**Dependencies**: Models/Views/Templates updated first
- Update 429 lines of company tests
- Modify integration tests
- Update test fixtures and factories
- Add tests for new relationships
#### 3.5 Signals & Search Update
- Update Django signals for new models
- Modify search indexing for new relationships
- Update search templates and views
- Verify search functionality
#### 3.6 Admin Interface Update
- Update admin configurations
- Modify admin templates if customized
- Update admin permissions
- Test admin functionality
### Phase 4: Cleanup 🧹
**Duration**: 2-3 days
**Risk Level**: 🟡 LOW-MEDIUM
**Rollback**: Difficult (requires restoration of removed code)
#### 4.1 Remove Companies App
- Remove companies/ directory
- Remove from INSTALLED_APPS
- Remove URL patterns
- Remove imports across codebase
#### 4.2 Remove Company Templates
- Remove templates/companies/ directory
- Remove company-related template tags
- Clean up cross-references
- Update template inheritance
#### 4.3 Documentation Update
- Update API documentation
- Update user documentation
- Update developer documentation
- Update README if needed
#### 4.4 Final Cleanup
- Remove unused imports
- Clean up migration files
- Update requirements if needed
- Final code review
## Critical Order of Operations
### ⚠️ MANDATORY SEQUENCE ⚠️
```
1. Phase 1: Create new entities (safe, reversible)
2. Phase 2: Migrate data (HIGH RISK - backup required)
3. Phase 3: Update dependencies in order:
a. Models FIRST (foreign keys)
b. Views SECOND (query logic)
c. Templates THIRD (display logic)
d. Tests FOURTH (validation)
e. Signals/Search FIFTH (integrations)
f. Admin SIXTH (management interface)
4. Phase 4: Cleanup (remove old code)
```
### 🚫 NEVER DO THESE OUT OF ORDER:
- Never update views before models
- Never update templates before views
- Never remove Company model before data migration
- Never skip database backups
- Never proceed without testing previous phase
## Database Schema Migration Strategy
### New Relationship Structure
```
Current:
Parks → Company (owner)
Rides → Company (manufacturer)
Target:
Parks → Operators (required, replaces Company.owner)
Parks → PropertyOwners (optional, new concept)
Rides → Manufacturers (optional, replaces Company)
Rides → Designers (optional, exists)
```
### Migration Script Approach
```python
# Data migration pseudocode:
def migrate_companies_to_new_structure(apps, schema_editor):
Company = apps.get_model('companies', 'Company')
Operator = apps.get_model('operators', 'Operator')
Manufacturer = apps.get_model('manufacturers', 'Manufacturer')
# Migrate park owners
for company in Company.objects.filter(used_as_park_owner=True):
operator = Operator.objects.create(
name=company.name,
# ... other fields
)
# Update park references
# Migrate ride manufacturers
for company in Company.objects.filter(used_as_manufacturer=True):
manufacturer = Manufacturer.objects.create(
name=company.name,
# ... other fields
)
# Update ride references
```
## Testing Strategy
### Phase-by-Phase Testing
```bash
# After each phase:
1. uv run manage.py test # Full test suite
2. Manual testing of affected functionality
3. Database integrity checks
4. Performance testing if needed
5. Rollback testing (Phase 2 especially)
```
### Critical Test Areas
- **Model Relationships**: Foreign key integrity
- **Data Migration**: No data loss, correct mapping
- **pghistory Integration**: Historical data preserved
- **Search Functionality**: New relationships indexed
- **Admin Interface**: CRUD operations work
- **Template Rendering**: No broken references
## Risk Mitigation Procedures
### Database Safety Protocol
```bash
# MANDATORY before Phase 2:
1. pg_dump thrillwiki_db > backup_pre_migration.sql
2. Test restore procedure: psql thrillwiki_test < backup_pre_migration.sql
3. Document rollback steps
4. Verify backup integrity
```
### Rollback Procedures
#### Phase 1 Rollback (Simple)
```bash
# Remove new models:
uv run manage.py migrate operators zero
uv run manage.py migrate manufacturers zero
# Remove from INSTALLED_APPS
```
#### Phase 2 Rollback (Complex)
```bash
# Restore from backup:
dropdb thrillwiki_db
createdb thrillwiki_db
psql thrillwiki_db < backup_pre_migration.sql
# Verify data integrity
```
#### Phase 3 Rollback (Moderate)
```bash
# Revert code changes:
git revert <migration_commits>
uv run manage.py migrate # Revert migrations
# Test functionality
```
## Success Criteria
### Phase 1 Success ✅
- [ ] New models created and functional
- [ ] Admin interfaces working
- [ ] Existing functionality unchanged
- [ ] All tests passing
### Phase 2 Success ✅
- [ ] All company data migrated correctly
- [ ] No data loss detected
- [ ] pghistory data preserved
- [ ] Foreign key relationships intact
- [ ] Rollback procedures tested
### Phase 3 Success ✅
- [ ] All 300+ company references updated
- [ ] New relationships functional
- [ ] Templates rendering correctly
- [ ] Search functionality working
- [ ] All tests updated and passing
### Phase 4 Success ✅
- [ ] Companies app completely removed
- [ ] No broken references remaining
- [ ] Documentation updated
- [ ] Code cleanup completed
## Timeline Estimate
| Phase | Duration | Dependencies | Risk Level |
|-------|----------|--------------|------------|
| Phase 1 | 2-3 days | None | 🟡 LOW |
| Phase 2 | 3-5 days | Phase 1 complete | 🔴 HIGH |
| Phase 3 | 5-7 days | Phase 2 complete | 🟠 MEDIUM-HIGH |
| Phase 4 | 2-3 days | Phase 3 complete | 🟡 LOW-MEDIUM |
| **Total** | **12-18 days** | Sequential execution | 🔴 HIGH |
## Implementation Readiness
### Prerequisites ✅
- [x] Comprehensive analysis completed
- [x] Migration plan documented
- [x] Risk assessment completed
- [x] Success criteria defined
### Next Steps
- [ ] Set up dedicated migration environment
- [ ] Create detailed migration scripts
- [ ] Establish backup and monitoring procedures
- [ ] Begin Phase 1 implementation
**Recommendation**: Proceed with Phase 1 implementation in dedicated environment with comprehensive testing at each step.