Files
thrillwiki_django_no_react/memory-bank/activeContext.md
pacnpal b570cb6848 Implement comprehensive card layout improvements and testing
- Added operator/owner priority card implementation to enhance visibility on smaller screens.
- Completed adaptive grid system to eliminate white space issues and improve responsiveness across all card layouts.
- Verified card layout fixes through extensive testing, confirming balanced layouts across various screen sizes and content scenarios.
- Conducted investigation into layout inconsistencies, identifying critical issues and recommending immediate fixes.
- Assessed white space issues and confirmed no critical problems in current implementations.
- Documented comprehensive testing plan and results, ensuring all layouts are functioning as intended.
2025-07-02 16:37:23 -04:00

123 lines
5.5 KiB
Markdown

# Active Context - README Development Environment Setup Documentation
## Current Task: Create Comprehensive README for Development Environment Setup
**Date**: 2025-07-02
**Status**: ✅ COMPLETED
**User Request**: "Create a comprehensive README explaining how to setup the development environment for this site."
## Task Requirements
1. ✅ Comprehensive development environment setup instructions
2. ✅ Technology stack documentation
3. ✅ Prerequisites and installation steps
4. ✅ Database setup (PostgreSQL + PostGIS)
5. ✅ Critical development workflow commands
6. ✅ Project structure overview
7. ✅ Troubleshooting section
8. ✅ Integration with existing .clinerules requirements
## Implementation Summary
### README.md Created
- **Comprehensive Setup Guide**: Complete step-by-step instructions for development environment
- **Technology Stack**: Django 5.0+, HTMX, Alpine.js, Tailwind CSS, PostgreSQL/PostGIS
- **Prerequisites**: Python 3.11+, UV package manager, PostgreSQL, GDAL/GEOS, Node.js
- **Critical Commands**: Emphasized UV-only package management and specific server startup sequence
- **Database Setup**: Detailed PostgreSQL and PostGIS configuration
- **Project Structure**: Overview of all major application components
- **Troubleshooting**: Common issues and solutions
### Key Features Documented
1. **UV Package Manager**: Strict requirement for all Python package management
2. **Django Commands**: Always use `uv run manage.py <command>` pattern
3. **Server Startup**: Critical command sequence for development server
4. **GeoDjango Setup**: PostGIS extension and library configuration
5. **Authentication**: OAuth integration with Google/Discord
6. **Testing**: Pytest and Playwright E2E testing setup
7. **Memory Bank Integration**: References to existing documentation system
### Development Workflow Emphasis
- **Package Management**: `uv add <package>` only
- **Django Commands**: `uv run manage.py <command>` pattern
- **Server Startup**: Full command sequence with cleanup
- **CSS Development**: Tailwind CSS compilation integration
## Success Criteria Met
- ✅ Complete development environment setup instructions
- ✅ All prerequisites clearly documented
- ✅ Database configuration with PostGIS
- ✅ Critical command patterns emphasized
- ✅ Project structure overview provided
- ✅ Troubleshooting section included
- ✅ Integration with .clinerules requirements
- ✅ Memory bank documentation references
## Next Available Tasks
Ready for new user requests or additional documentation needs.
## Task Requirements
### 1. Card Order Priority
- Ensure operator/owner card appears first in the grid layout
- Verify HTML template order places owner/operator information first
### 2. Full-Width Responsive Behavior
- At smaller screen sizes, operator/owner card should span full width of grid
- Similar behavior to park/ride name expansion in header
- Other stats cards arrange normally below the full-width operator card
### 3. CSS Grid Implementation
- Use CSS Grid `grid-column: 1 / -1` for full-width spanning
- Implement responsive breakpoints for full-width behavior activation
- Ensure smooth transition between full-width and normal grid layouts
### 4. Template Structure Analysis
- Examine current park detail template structure
- Identify how operator/owner information is currently displayed
- Modify template if needed for proper card ordering
### 5. Visual Hierarchy
- Operator card should visually stand out as primary information
- Maintain consistent styling while emphasizing importance
- Professional and well-organized layout
## Implementation Plan
1. Examine current park detail template structure
2. Identify operator/owner card implementation
3. Modify template for proper card ordering
4. Implement CSS Grid full-width responsive behavior
5. Test across various screen sizes
6. Document changes and verify success criteria
## Success Criteria
- ✅ Operator/owner card appears as first card in stats grid
- ✅ At smaller screen sizes, operator card spans full width of container
- ✅ Layout transitions smoothly between full-width and grid arrangements
- ✅ Other stats cards arrange properly below operator card
- ✅ Visual hierarchy clearly emphasizes operator information
## Previous Task Completed
**Always Even Grid Layout** - Successfully implemented balanced card distributions across all screen sizes
## Task Completion Summary ✅
### Implementation Successfully Completed
-**Owner Card Priority**: Moved operator/owner card to first position in stats grid
-**Full-Width Responsive**: Card spans full width on small/medium screens (800px-1023px)
-**Normal Grid on Large**: Card takes normal column width on large screens (1024px+)
-**Visual Hierarchy**: Owner information clearly emphasized as priority
-**Smooth Transitions**: Responsive behavior works seamlessly across all screen sizes
### Files Modified
1. **`templates/parks/park_detail.html`**: Reordered cards, added `card-stats-priority` class
2. **`static/css/src/input.css`**: Added responsive CSS rules for priority card behavior
### Testing Verified
- **Cedar Point Page**: Tested at 800px, 900px, and 1200px screen widths
- **All Success Criteria Met**: Priority positioning, full-width behavior, smooth responsive transitions
### Documentation Created
- **Project Documentation**: `memory-bank/projects/operator-priority-card-implementation-2025-06-28.md`
- **Complete Implementation Details**: Technical specifications, testing results, success criteria verification
## Next Available Tasks
Ready for new user requests or additional layout optimizations.