mirror of
https://github.com/pacnpal/thrillwiki_laravel.git
synced 2025-12-20 08:11:10 -05:00
128 lines
4.5 KiB
Markdown
128 lines
4.5 KiB
Markdown
# Progress Tracking
|
|
|
|
## Work Done
|
|
|
|
### Documentation System Enhancement [2025-02-26 20:08]
|
|
- Implemented Handoffs System alongside Memory Bank
|
|
- Created handoffs directory structure and templates
|
|
- Set up instruction documents and guidelines
|
|
- Created first handoff document
|
|
- Enhanced project documentation strategy
|
|
- Established clear documentation workflows
|
|
|
|
### Filament Admin Interface Setup [2025-02-26 20:22]
|
|
- Installed core Filament packages (filament/filament:^3.2)
|
|
- Added permissions package (spatie/laravel-permission:^6.3)
|
|
- Installed notification system (filament/notifications:^3.2)
|
|
- Published Filament configuration and assets
|
|
- Created admin panel provider
|
|
- Published permission migrations and config
|
|
- Set up base admin panel structure
|
|
|
|
### Permission System Implementation [2025-02-26 20:39]
|
|
- Created DesignerPolicy with granular permissions
|
|
- Implemented role-based access control
|
|
- Set up permission seeder with default roles
|
|
- Added modular permission structure
|
|
- Prepared for audit trail integration
|
|
|
|
### Admin Panel Configuration [2025-02-26 20:38]
|
|
- Set up AdminPanelProvider with proper structure
|
|
- Configured navigation groups for different sections
|
|
- Added branding and UI customization
|
|
- Set up middleware and authentication
|
|
- Prepared structure for multiple admin panels
|
|
|
|
### Designer Resource Implementation [2025-02-26 20:37]
|
|
- Created Designer model with slug history support
|
|
- Implemented Filament resource with form layouts
|
|
- Added relationship management for rides
|
|
- Set up proper validations and filters
|
|
- Configured computed columns and bulk actions
|
|
- Added URL and date handling
|
|
|
|
### Project Analysis and Gap Assessment [2025-02-26]
|
|
- Completed comprehensive project analysis
|
|
- Identified implemented vs missing features
|
|
- Created detailed implementation priority list
|
|
- Documented technical considerations and risks
|
|
- Established clear next steps and priorities
|
|
- Added analysis documentation to memory bank
|
|
|
|
### Search and Autocomplete Implementation [2025-02-25]
|
|
- Created AutocompleteComponent for real-time search suggestions
|
|
- Implemented keyboard navigation support (up/down/enter/escape)
|
|
- Added dark mode compatibility
|
|
- Integrated suggestions with SearchComponent
|
|
- Fixed SearchComponent structure and removed duplicates
|
|
- Added accessibility features (ARIA labels, keyboard support)
|
|
- Updated documentation to reflect changes
|
|
- Added feature parity documentation
|
|
- Enhanced search UX with real-time filtering
|
|
|
|
### Documentation and Testing [2025-03-23]
|
|
- Created comprehensive SearchComponents.md documentation
|
|
- Documented keyboard shortcuts and navigation
|
|
- Added accessibility implementation details
|
|
- Created API integration guide
|
|
- Documented mobile responsiveness features
|
|
- Added testing guidelines for all features
|
|
- Verified dark mode consistency
|
|
- Tested filter combinations
|
|
- Validated keyboard navigation
|
|
|
|
### Parks Model Migration [2025-03-23]
|
|
- Implemented Park and ParkArea models with all required fields
|
|
- Added ParkStatus enum with helper methods
|
|
- Created migrations for basic fields and relationships
|
|
- Added statistics fields to both models
|
|
- Implemented nested areas support with position handling
|
|
- Added photo management functionality
|
|
- Created traits for common functionality (HasLocation, HasSlugHistory, HasParkStatistics)
|
|
- Added proper indexing for common queries
|
|
- Documented all enhancements in ParkModelEnhancements.md
|
|
|
|
## Next Steps
|
|
|
|
### Immediate Tasks
|
|
1. Parks Implementation
|
|
- Implement statistics update jobs
|
|
- Create area reordering UI
|
|
- Add area management components
|
|
- Set up photo upload functionality
|
|
- Create park detail pages
|
|
|
|
2. Feature Completion
|
|
- Complete unit test suite
|
|
- Add integration tests
|
|
- Set up automated accessibility tests
|
|
- Implement performance monitoring
|
|
|
|
### Future Enhancements
|
|
1. Companies Module
|
|
- Design company relationships
|
|
- Plan ownership tracking
|
|
- Consider integration points
|
|
|
|
2. Analytics System
|
|
- Plan data collection
|
|
- Design reporting system
|
|
- Consider performance metrics
|
|
|
|
3. Wiki System
|
|
- Design article management
|
|
- Plan version control
|
|
- Consider collaboration tools
|
|
|
|
### Bugs and Issues
|
|
- No critical issues identified
|
|
- Need to verify Filament compatibility
|
|
- Consider history tracking performance
|
|
- Monitor email system reliability
|
|
|
|
## Implementation Notes
|
|
- Using Laravel/Livewire for core functionality
|
|
- Implementing Filament for admin interfaces
|
|
- Following strict feature parity requirements
|
|
- Maintaining Django-equivalent capabilities
|
|
- Focusing on maintainable, performant code |